Summary of Scope of Work
- Preparation and Protection:
- Protect the floor in the ground floor (GF) meeting room.
- Install polythene hoarding to the glazed partition.
- Demolition and Removal:
- Remove wall finishes in the GF meeting room.
- Strip back the ceiling as required and set aside for re-installation.
- Remove ceiling finishes on the bulkhead to expose floor joists for propping.
- Uplift and dispose of all carpet tiles.
- Structural Work:
- Structural engineer to design and provide sketches for propping.
- Supply and install props as per structural engineer’s recommendations.
- Replace the existing timber column with a 152x152x30kg UC steel column, with 10mm plates welded to the top and bottom.
- Specialist Treatment:
- Treat affected areas for dry rot eradication.
- Reconstruction:
- Rebuild the boxing at the front elevation internally, insulate with Rockwool mineral insulation, and finish with plasterboard.
- Reboard and skim the left-hand wall in the meeting room.
- Reboard the bulkhead, decorate, and reinstate the suspended ceiling.
- Finishing:
- Redecorate the entire room.
- Install new carpet tiles across the meeting room.
- Electrical and Systems:
- Electrician to isolate/recommission all electrics at the start and end of the project.