PROJECT
High Level Replacement Glazing

LOCATION
Bridge Street, Birmingham

CLIENT
Hyatt Regency

DESCRIPTION
Supply and install of glazing at high level

Having noticed a number of cracks in the windows to another room the maintenance team at the Hyatt Regency Hotel appointed T and D to safely replace the damaged glass with new units.

The first stage of the project was to ensure all works were completed safely, ensuring the risk posed by the high level works were suitably and sufficiently controlled to keep the T and D team and all third parties safe.

Working with our external consultants our QHSE manager developed a safe system of work involving the existing cradle on site, scaffold protection at ground level and a temporary winch to the roof for lifting/lowering.

With everything in place inspections on all lifting equipment was carried out by one of our approved contractors, wind speeds were checked and the team were given the green light to proceed.

With a full team on site works were completed safely and to our high standards within two days ensuring minimum disruption and maximum satisfaction for the client.

SPECIFICATION

  • Removal of existing glass at high level
  • Supply and install of new glass at high level
  • All works fully compliant to the WAH Regulations and CDM