Refurbishment
Restoration
Fabrication/Steel Work
Swindon - Exterior Stairwell Refurbishment
Lloyds Swindon, High Street, Wiltshire, SN1 3EN
- Conducted an on-site survey alongside a metal fabrication specialist to plan off-site fabrication effectively
- Delivered all plant and materials to the site and set up a safe, isolated working area following thorough H&S procedures and operative inductions
- Erected and dismantled alloy towers daily to provide safe, high-level working access, ensuring all inspections were completed before each use.
- Removed and replaced end-of-life treads across six stair sets:
- 1st stair set:8 treads replaced with 10mm steel plates.2nd to 6th stair sets: Replaced a total of 32 treads and landings.
- Applied Black Hammerite paint to all new metal components, matching the existing aesthetic and ensuring durability.
- Cleaned the site and disposed of all waste off-site, leaving the area safe and tidy.